中日韩典型船型建造关键周期对标分析
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Benchmarking Analysis of Key Construction Cycle of Typical China-Japan-ROK Ship Types
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    选择2021年度中日韩造船企业交付的集装箱船、散货船、油船和气体船等4类12种船型进行建造关键周期的对标分析,目的在于找出中日韩造船企业在船舶建造周期方面的差距,为中国造船企业缩短船舶建造周期提供改进标杆。

    Abstract:

    Four kinds of 12 types of ship types delivered by the China-Japan-ROK shipbuilding enterprises in 2021, including container ships, bulk carriers, oil carriers, and gas carriers, are selected to conduct the benchmarking analysis of key construction cycle, with the purpose of finding out the gap of ship construction cycle of China-Japan-ROK shipbuilding enterprises, and providing improvement standard for Chinese shipbuilding enterprises to shorten the ship construction cycle.

    参考文献
    相似文献
    引证文献
引用本文

饶靖,郄金波,周荣富,谢子明,谢新,谢子明,谢新.中日韩典型船型建造关键周期对标分析[J].造船技术,2023,(01):88-92

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-02-20
  • 出版日期: