固定支架式双壁管的预制安装方法
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Prefabrication and Installation Method of Double-Wall Pipe with Fixed Support
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为推广双壁管预制及安装技术,详细描述45 000 m3 LNG运输船采用的一种固定支架式燃气双壁管的预制安装过程,主要包括双壁管的结构特点,几种基本型双壁管的成形方法与焊缝焊接顺序,双壁管在船上安装、试压及清洗的工序特点、难点和注意事项,可作为类似项目管理团队及相关人员的参考。

    Abstract:

    In order to popularize the prefabrication and installation technology of double-wall pipe,the prefabrication and installation process of gas double-wall pipe with the fixed support used in the 45 000 m3 LNG carrier is described in detail, mainly including the structural characteristics of double-wall pipe, shaping methods and weld welding sequences of several basic double-wall pipes, and procedure characteristics, difficulties, and notes for double-wall pipe to install, make the pressure test, and clean on the ship, which can be used as a reference for the similar project management team and relevant personnel.

    参考文献
    相似文献
    引证文献
引用本文

任成德,吴红根.固定支架式双壁管的预制安装方法[J].造船技术,2020,(04):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2020-09-15
  • 出版日期: