Abstract:The construction of 250 000 t ore carrier has the higher requirements in the hoisting, precision and welding. Through the research on the construction of 250 000 t large ore carrier, the key technologies that can be applied to the actual production and construction are obtained so as to improve the construction quality, to shorten the construction time, and to reduce the construction cost, which provides the technical experience for the construction of corresponding large ships.