Abstract:Based on the importance of palletization management of hull parts in main hull construction, and combined with the actual production flow, a new pallet division scheme on the basis of unit-assembly is established, which can effectively improve the circulation efficiency of parts through the real ship inspection, and has a strong guiding significance for the main hull construction of ship with the large and complex structure.